CEI Brings over 25 years of expertise in delivering complex power distribution and generation projects for the public and private sectors. Our portfolio includes transformer installations, pumping plants, generator projects, and the construction of both overhead and underground power lines.
2026 Anderson Library Solar & Generator Addition
UPCOMING: Project includes the installation of a new standby generator (80kw) with associated infrastructure at the Anderson Library. In addition, a ground mount photovoltaic system will be installed. CEI is responsible for providing and installing the standby generator.
Contract Amount: $247,311.69
Contract Amount: $247,311.69
2026 MOTCO USACE ERCIP 6.25MW Generation Plant
UPCOMING: Project includes coordination with USACE, pulling ~15,000 ft of cable, installation of conduit and stubups, and setting of electrical switchgear. CEI's familiarity with USACE regulations and procedures well positions us as a trusted subcontractor for this generation plant project.
Contract Amount: $846,510.00
Contract Amount: $846,510.00
2023 SLDMWA O'Neill Pumping Plant Power Transformer Rehab
ONGOING: Project includes the rehabilitation of four (4) single phase main transformers at the O'Neill Pumping-Generating Plant. Key work includes rehabilitation three in-service and one spare transformer, refilling all transformers with synthetic ester fluid, replacing bushings and other critical components, and coordinating outages, plans, tests, and other critical tasks.
Contract Amount: $5,358,818.79
Contract Amount: $5,358,818.79
2022 MOTCO USACE Wharf 2 Generator Site Work
Scope included the design and construction of a complete stand-by power plant to power the MOTCO pier. Components included fuel tanks, transfer pumps, switchgear, load bank, ATS, transformer, and other miscellaneous electrical and mechanical equipment. Civil site work included site preparation, concrete pads, electrical grounding, site lighting, fencing and bollards, and required site demolition.
Contract Amount: $4,890,000.00
Contract Amount: $4,890,000.00
2019 Wastewater Treatment Plant Emergency Generator Replacement Project, South Lake Tahoe
Scope included replacing an emergency generator for the wastewater treatment plant, beginning with demolition of the existing generator, breakpoint chamber, engine driven pump motor, main electrical switchgear, and miscellaneous piping and ductbanks, and concluding with the installation of a new emergency generator within a new building, electrical switchgear, piping, and fuel tank. SItework included regrading various locations to improve drainage, relocating existing utility piping, and installing new electrical ductbanks.
Contract Amount: $6,136,535.00
Contract Amount: $6,136,535.00
2018 Overhead Electrical System Replacement & Upgrade, Department of Fish & Wildlife, Fish Springs Hatchery
Scope including repairing and replacing material, cross arms, and hardware on deteriorating wood power poles, as well as replacing overhead electrical transformers, including ~2,300 feet of overhead conductor and underground 12kv.
Contract Amount: $598,000.00
Contract Amount: $598,000.00
1994 City of Redding Peaking Power Plant
CEI furnished all labor, material and equipment to install phase two electrical for Zurn Nepco at the Redding Peaking Power Plant, finish grading, foundations, control building, miscellaneous pipe supports, medium voltage cable, control cables, underground duct bank , buss duct, switchgear, testing and commissioning of the three 20 megawatt generators at the City of Redding Power Plant.
Contract Amount: $1,307,000.00
Contract Amount: $1,307,000.00
CEI Power Generation Portfolio
See also Caltrans & Substation Construction
2019 Wastewater Treatment Plant Emergency Generator Replacement Project
2019 Diablo Valley College Replacement of Main Electrical Switchgear
2018 Overhead Electrical System Replacement & Upgrade
2014 Electrical Underground Rebuild and Re-Conductor Project
2014 Box Canyon Hydroelectric PLC Control & Relay Upgrade Project
2012 12kv Underground Distribution System Cable Replacement
2012 Hewlett Subdivision 12kv Upgrade
2011 Bellvue Unified School District Solar
2011 Alternate Intake Project, 69kv Transmission Line
2010 Wild Horse Ranch, Platina, CA
2010 Big O Tires Rooftop Array
2009 Butte College Solar Project
2008 Miliptas Unified School District Solar Project
2003 Alameda County Fairgrounds Photovoltaic
2002 Seaside Park Photovoltaic
2001 City of Redding Generator
1994 City of Redding Peaking Power Plant
2019 Wastewater Treatment Plant Emergency Generator Replacement Project
2019 Diablo Valley College Replacement of Main Electrical Switchgear
2018 Overhead Electrical System Replacement & Upgrade
2014 Electrical Underground Rebuild and Re-Conductor Project
2014 Box Canyon Hydroelectric PLC Control & Relay Upgrade Project
2012 12kv Underground Distribution System Cable Replacement
2012 Hewlett Subdivision 12kv Upgrade
2011 Bellvue Unified School District Solar
2011 Alternate Intake Project, 69kv Transmission Line
2010 Wild Horse Ranch, Platina, CA
2010 Big O Tires Rooftop Array
2009 Butte College Solar Project
2008 Miliptas Unified School District Solar Project
2003 Alameda County Fairgrounds Photovoltaic
2002 Seaside Park Photovoltaic
2001 City of Redding Generator
1994 City of Redding Peaking Power Plant

