Powered by Create your own unique website with customizable templates.
Welcome to Cal Electro Inc.
  • CEI HOME
  • Construction Portfolio
    • AIRPORT CONSTRUCTION
    • CALTRANS
    • POWER DISTRIBUTION & GENERATION
    • SUBSTATION CONSTRUCTION
    • SPECIALTY CONSTRUCTION
  • Other
    • EMPLOYMENT OPPORTUNITIES
    • TIME CARD

Power Distribution & Generation

CEI Brings over 25 years of expertise in delivering complex power distribution and generation projects for the public and private sectors. Our portfolio includes transformer installations, pumping plants, generator projects, and the construction of both overhead and underground power lines. 

2026 Anderson Library Solar & Generator Addition

UPCOMING: Project includes the installation of a new standby generator (80kw) with associated infrastructure at the Anderson Library. In addition, a ground mount photovoltaic system will be installed. CEI is responsible for providing and installing the standby generator.

​Contract Amount:   $247,311.69

2026 MOTCO USACE ERCIP 6.25MW Generation Plant

UPCOMING: Project includes coordination with USACE, pulling ~15,000 ft of cable, installation of conduit and stubups, and setting of electrical switchgear. CEI's familiarity with USACE regulations and procedures well positions us as a trusted subcontractor for this generation plant project. 

​Contract Amount:   $846,510.00

2023 SLDMWA O'Neill Pumping Plant Power Transformer Rehab

ONGOING: Project includes the rehabilitation of four (4) single phase main transformers at the O'Neill Pumping-Generating Plant. Key work includes rehabilitation three in-service and one spare transformer, refilling all transformers with synthetic ester fluid, replacing bushings and other critical components, and coordinating outages, plans, tests, and other critical tasks.

Contract Amount: $5,358,818.79

2022 MOTCO USACE Wharf 2 Generator Site Work

Scope included the design and construction of a complete stand-by power plant to power the MOTCO pier. Components included fuel tanks, transfer pumps, switchgear, load bank, ATS, transformer, and other miscellaneous electrical and mechanical equipment. Civil site work included site preparation, concrete pads, electrical grounding, site lighting, fencing and bollards, and required site demolition. 

​Contract Amount: $4,890,000.00

2019 Wastewater Treatment Plant Emergency Generator Replacement Project, South Lake Tahoe

​
Scope included replacing an emergency generator for the wastewater treatment plant, beginning with demolition of the existing generator, breakpoint chamber, engine driven pump motor, main electrical switchgear, and miscellaneous piping and ductbanks, and concluding with the installation of a new emergency generator within a new building, electrical switchgear, piping, and fuel tank. SItework included regrading various locations to improve drainage, relocating existing utility piping, and installing new electrical ductbanks.

​Contract Amount: $6,136,535.00

2018 Overhead Electrical System Replacement & Upgrade, Department of Fish & Wildlife, Fish Springs Hatchery

Scope including repairing and replacing material, cross arms, and hardware on deteriorating wood power poles, as well as replacing overhead electrical transformers, including ~2,300 feet of overhead conductor and underground 12kv. 

Contract Amount: $598,000.00


1994 City of Redding Peaking Power Plant
CEI furnished all labor, material and equipment to install phase two electrical for Zurn Nepco at the Redding Peaking Power Plant, finish grading, foundations, control building, miscellaneous pipe supports, medium voltage cable, control cables, underground duct bank , buss duct, switchgear, testing and commissioning of the three 20 megawatt generators at the City of Redding Power Plant.

Contract Amount: $1,307,000.00 


CEI Power Generation Portfolio

See also Caltrans & Substation Construction

2019      Wastewater Treatment Plant Emergency Generator Replacement Project

2019      Diablo Valley College Replacement of Main Electrical Switchgear

2018      Overhead Electrical System Replacement & Upgrade

2014      Electrical Underground Rebuild and Re-Conductor Project

2014      Box Canyon Hydroelectric PLC Control & Relay Upgrade Project

2012      12kv Underground Distribution System Cable Replacement

2012      Hewlett Subdivision 12kv Upgrade

2011      Bellvue Unified School District Solar

2011      Alternate Intake Project, 69kv Transmission Line

2010      Wild Horse Ranch, Platina, CA


2010      Big O Tires Rooftop Array

2009      Butte College Solar Project

2008      Miliptas Unified School District Solar Project

2003      Alameda County Fairgrounds Photovoltaic

2002      Seaside Park Photovoltaic 

2001      City of Redding Generator

1994      City of Redding Peaking Power Plant

​

Proudly powered by Weebly
  • CEI HOME
  • Construction Portfolio
    • AIRPORT CONSTRUCTION
    • CALTRANS
    • POWER DISTRIBUTION & GENERATION
    • SUBSTATION CONSTRUCTION
    • SPECIALTY CONSTRUCTION
  • Other
    • EMPLOYMENT OPPORTUNITIES
    • TIME CARD