The jobs that are not mainly electrical, carried by the same crews.
Cranes, towers and structures, by the same crews
Capability
The specialty record is what self-performing looks like when the job is not mainly electrical: gantry crane rehabilitation at Shasta Dam and crane modifications at Folsom for the Bureau of Reclamation, a 120-foot communications tower and vault on Colby Mountain for the CHP, the Sacramento Tower Bridge, a college gas line, and wastewater treatment improvements at Biggs.
Drilling is self-performed, piers and footings as well as horizontal directional drilling, and medium voltage cable splicing is NCSCB certified. Load testing a 140 ton crane with water weights is the kind of scope that makes these jobs specialty rather than electrical, and they carry structural, mechanical and civil work alongside the electrical under one contract and one schedule.
Drilling, foundations, structural steel and mechanical work are our own crews. The tower on Colby Mountain included the foundations, a generator building, a photovoltaic field and the propane system.
- Mountaintop and remote sites
- Tower and radar sites with haul, weather and generation constraints.
- Dam and powerhouse work
- Crane and controls work inside operating Reclamation and DWR facilities.
The record
Every specialty construction contract published in full, newest first.
Open a title for the write-up, the photographs and the contract detail.
| Project | Owner | Year | Contract |
|---|---|---|---|
| CHP | 2015 | $2,089,000 | |
Cal Electro transported, erected and installed an owner-furnished 120-foot tower, self-supporting, four-legged and pre-manufactured, moving it from West Sacramento to the Colby Mountain site. Cal Electro also built the foundations, a separate generator building with emergency backup generator, a photovoltaic panel field, a propane fuel system and the electrical utilities. Cal Electro delivered Communications Towers & Vault, Colby Mountain for CHP in Forest Ranch, Tehama County, California in 2015, a $2,089,000 contract. | |||
| City of Biggs | 2014 | $1,839,000 | |
Cal Electro built the plant improvements: new influent piping and manholes, a spiral mechanical screen, a new concrete sewer influent wet well, an influent pump distribution system, field piping, valves, a flow meter and a new influent sampler, tied into the existing gravity and force main system. Electrical work covered services for the new equipment, a SCADA system and its telemetry, and a backup generator. The contract also included a manual bar screen with associated piping modifications, replacement of field valves across the facility, repair or replacement of a vertical pump, and fencing and gates. Cal Electro delivered Phase 1 Wastewater Treatment Improvement Project, Biggs for City of Biggs in California in 2014, a $1,839,000 contract. | |||
| Oregon Air Guard | 2013 | $51,160 | |
Cal Electro designed and installed new lightning protection for the Oregon Air Guard. Cal Electro delivered Oregon Air Guard Lightning Protection in 2013, a $51,160 contract. | |||
| Shasta College | 2011 | ||
| USBR | 2003 | $1,023,500 | |
Cal Electro modified three cranes, installing new load cells, VFDs, festoon systems, wire rope, rail foundation, operator controls and a 140-ton trolley. The work included load testing the 140-ton crane with water weights on Folsom Dam Boulevard. Cal Electro delivered Folsom Cranes for USBR in California in 2003, a $1,023,500 contract. | |||
| USBR | 2003 | $996,000 | |
Cal Electro rehabilitated a 125-ton gantry crane at Shasta Dam, installing new VSDs, an engine generator, an automatic rope re-winder, operator controls, wire rope, and a fuel tank and platform. Cal Electro delivered Shasta Crane for USBR in 2003, a $996,000 contract. | |||
| El Dorado Irrigation District | 2002 | $690,000 | |
Cal Electro installed flood protection at the power house: removing windows, placing and grout-injecting concrete walls, demolishing existing equipment and walls, fitting water-tight doors, and carrying out erosion control outside the building. Cal Electro delivered EID Power House for El Dorado Irrigation District in 2002, a $690,000 contract. | |||
| DWR | 2001 | $1,600,000 | |
Cal Electro installed the crane controls at the Oroville power house for the Department of Water Resources. Cal Electro delivered Oroville Power House for DWR in California in 2001, a $1,600,000 contract. | |||
| City of Sacramento | 1998 | $385,000 | |
Bids
Bidding specialty construction work? Send the solicitation and the bid date.
Plans and addenda go to info@calelectroinc.com, or call (530) 223-5937.
Next capability