Cal Electro's two largest published contracts are both water jobs.
Water and wastewater electrical, on live plants
Capability
The two largest contracts on Cal Electro’s record are water work. The South Lake Tahoe wastewater treatment plant generator replacement, $6,136,535 in 2019, delivered a new emergency generator, switchgear, fuel tank and building on a live plant. The O’Neill Pumping Plant transformer rehabilitation for San Luis & Delta-Mendota Water Authority, $5,358,818.79, rehabilitated four single-phase main transformers under coordinated outages.
Behind those sit pumping plant upgrades for Caltrans from San Luis Obispo to Bakersfield, emergency wells, and hatchery power for the Department of Fish and Wildlife. The Biggs Phase 1 treatment improvements took in influent piping and manholes, a spiral mechanical screen, a concrete sewer influent wet well, an influent pump distribution system, field piping, valves and flow meter, and SCADA telemetry.
Pumping plant work carries civil, mechanical and piping scope alongside the electrical, all of it our own crews.
- Live facilities
- Treatment plants and pumping stations stay in service while their power systems are replaced.
- Synthetic ester fluids
- Transformer rehabilitation including refilling with synthetic ester fluid and bushing replacement.
The record
Every water & wastewater contract published in full, newest first.
Open a title for the write-up, the photographs and the contract detail.
| Project | Owner | Year | Contract |
|---|---|---|---|
| Caltrans | 2023 | $1,300,000 | |
| SLDMWA | 2023 · ongoing | $5,358,818.79 | |
Cal Electro rehabilitated four single-phase main transformers at the O'Neill Pumping-Generating Plant, three in service and one spare, refilling them with synthetic ester fluid and replacing bushings and other critical components. The work was sequenced around coordinated outages, with the plans and testing that required. Cal Electro is delivering O'Neill Pumping Plant Power Transformer Rehabilitation for SLDMWA in Merced County, California, 2023, a $5,358,818.79 contract. | |||
| City of South Lake Tahoe | 2019 | $6,136,535 | |
Cal Electro replaced the treatment plant's emergency generator, beginning with demolition of the existing generator, breakpoint chamber, engine-driven pump motor, main electrical switchgear, and miscellaneous piping and duct banks. The replacement went into a new building, with new electrical switchgear, piping and a fuel tank. Site work regraded several areas to improve drainage, relocated existing utility piping and installed new electrical duct banks. Cal Electro delivered Wastewater Treatment Plant Emergency Generator Replacement, South Lake Tahoe for City of South Lake Tahoe in California in 2019, a $6,136,535 contract. | |||
| Alderpoint County Water District | 2014 | $1,530,332.49 | |
| City of Biggs | 2014 | $1,839,000 | |
Cal Electro built the plant improvements: new influent piping and manholes, a spiral mechanical screen, a new concrete sewer influent wet well, an influent pump distribution system, field piping, valves, a flow meter and a new influent sampler, tied into the existing gravity and force main system. Electrical work covered services for the new equipment, a SCADA system and its telemetry, and a backup generator. The contract also included a manual bar screen with associated piping modifications, replacement of field valves across the facility, repair or replacement of a vertical pump, and fencing and gates. Cal Electro delivered Phase 1 Wastewater Treatment Improvement Project, Biggs for City of Biggs in California in 2014, a $1,839,000 contract. | |||