Cal Electro's two largest published contracts are both water jobs.

Water and wastewater electrical, on live plants

Capability

The two largest contracts on Cal Electro’s record are water work. The South Lake Tahoe wastewater treatment plant generator replacement, $6,136,535 in 2019, delivered a new emergency generator, switchgear, fuel tank and building on a live plant. The O’Neill Pumping Plant transformer rehabilitation for San Luis & Delta-Mendota Water Authority, $5,358,818.79, rehabilitated four single-phase main transformers under coordinated outages.

Behind those sit pumping plant upgrades for Caltrans from San Luis Obispo to Bakersfield, emergency wells, and hatchery power for the Department of Fish and Wildlife. The Biggs Phase 1 treatment improvements took in influent piping and manholes, a spiral mechanical screen, a concrete sewer influent wet well, an influent pump distribution system, field piping, valves and flow meter, and SCADA telemetry.

Pumping plant work carries civil, mechanical and piping scope alongside the electrical, all of it our own crews.

Live facilities
Treatment plants and pumping stations stay in service while their power systems are replaced.
Synthetic ester fluids
Transformer rehabilitation including refilling with synthetic ester fluid and bushing replacement.
Why we self-perform
5Projects published in full
$6,136,535Largest published contract

The record

Every water & wastewater contract published in full, newest first.

Open a title for the write-up, the photographs and the contract detail.

Water & Wastewater: 5 contracts, newest first, with owner, year and published contract amount.
ProjectOwnerYearContract
Caltrans2023$1,300,000

Cal Electro installed the mechanical and electrical systems for a new pump at the 13th Street Pump Station.

Cal Electro delivered SLO Emergency Pumping Plant Upgrade for Caltrans in San Luis Obispo, California in 2023, a $1,300,000 contract.

SLDMWA2023 · ongoing$5,358,818.79

Cal Electro rehabilitated four single-phase main transformers at the O'Neill Pumping-Generating Plant, three in service and one spare, refilling them with synthetic ester fluid and replacing bushings and other critical components. The work was sequenced around coordinated outages, with the plans and testing that required.

  • Electrical
  • Mechanical
  • Outage coordination
  • Live facility

Cal Electro is delivering O'Neill Pumping Plant Power Transformer Rehabilitation for SLDMWA in Merced County, California, 2023, a $5,358,818.79 contract.

City of South Lake Tahoe2019$6,136,535

Cal Electro replaced the treatment plant's emergency generator, beginning with demolition of the existing generator, breakpoint chamber, engine-driven pump motor, main electrical switchgear, and miscellaneous piping and duct banks. The replacement went into a new building, with new electrical switchgear, piping and a fuel tank. Site work regraded several areas to improve drainage, relocated existing utility piping and installed new electrical duct banks.

  • Electrical
  • Civil
  • Mechanical
  • Live facility

Cal Electro delivered Wastewater Treatment Plant Emergency Generator Replacement, South Lake Tahoe for City of South Lake Tahoe in California in 2019, a $6,136,535 contract.

Alderpoint County Water District2014$1,530,332.49

Cal Electro installed a new domestic water treatment plant for the Alderpoint County Water District.

  • Civil

Cal Electro delivered Alderpoint Water System Improvements for Alderpoint County Water District in California in 2014, a $1,530,332.49 contract.

City of Biggs2014$1,839,000

Cal Electro built the plant improvements: new influent piping and manholes, a spiral mechanical screen, a new concrete sewer influent wet well, an influent pump distribution system, field piping, valves, a flow meter and a new influent sampler, tied into the existing gravity and force main system. Electrical work covered services for the new equipment, a SCADA system and its telemetry, and a backup generator. The contract also included a manual bar screen with associated piping modifications, replacement of field valves across the facility, repair or replacement of a vertical pump, and fencing and gates.

Cal Electro delivered Phase 1 Wastewater Treatment Improvement Project, Biggs for City of Biggs in California in 2014, a $1,839,000 contract.

Bids

Bidding water & wastewater work? Send the solicitation and the bid date.

Invite us to bid

Plans and addenda go to info@calelectroinc.com, or call (530) 223-5937.