Energized construction to 500kV, for federal power administrations and municipal utilities.
Substation construction to 500kV, inside energized yards
Capability
Cal Electro builds and rebuilds substations and switchyards for federal power administrations, municipal utilities and universities, including construction within energized substations at 500kV. The record runs from a 35kV substation repair for the US Navy at China Lake to shunt cap breaker and ground switch replacement in the 500kV bays at Tracy for Western Area Power Administration.
Recent scope has covered 500kV power circuit breakers, motor operated disconnecting switches and ground switches, 230kV and 115kV government-furnished station service transformers and SSVTs, precast cable trench, pre-manufactured control buildings, protective relay systems, SCADA circuits and station service switchgear. Much of the major equipment is owner supplied, so the schedule is set by outage windows and delivery dates.
Foundations, trenching, conduit and control wiring are our own crews. On a substation job that means the civil work and the electrical work hold one schedule.
- Energized work
- Crews work adjacent to and inside energized yards to 500kV, under the owner’s clearance and switching procedures.
- Outage coordination
- Breaker and bank replacements are sequenced against the owner’s outage windows, with tested fallback positions.
- Government-furnished equipment
- Receiving, storing, setting and terminating owner-supplied breakers, transformers and switchgear.
The record
Every substation construction contract published in full, newest first.
Open a title for the write-up, the photographs and the contract detail.
| Project | Owner | Year | Contract |
|---|---|---|---|
| WAPA | 2025 | $874,185 | |
Cal Electro demolished the existing Unit Substation DZA, pad-mount transformer and standby generator, then installed a 230kV bay with a motor-operated disconnect switch, SSVTs and associated material. The work also covered a pad-mount transformer, an automatic transfer switch, three safety switches, 35kV power cable, a main distribution switchboard, and the steel structures and foundations that carry them. Cal Electro delivered Olinda Substation, Station Service Upgrades for WAPA in Shasta County, California in 2025, a $874,185 contract. | |||
| WAPA | 2025 · ongoing | $2,237,150 | |
Cal Electro is removing and replacing the 500kV power circuit breakers, motor-operated disconnecting switches and motor-operated ground switches in Bay T8, and installing the associated conduit, outdoor bus and control cables. Cal Electro is delivering Tracy 500kV Substation, Bay T8 Breaker & Switch Replacement for WAPA in California, 2025, a $2,237,150 contract. | |||
| WAPA | 2024 | $2,319,355 | |
Cal Electro removed and replaced the 500kV power circuit breakers, motor-operated disconnecting switches and motor-operated ground switches in Bay T10. The contract also covered a surface trench with its associated electrical equipment and site development. Cal Electro delivered Tracy 500kV Substation, Bay T10 Breaker & Switch Replacement for WAPA in California in 2024, a $2,319,355 contract. | |||
| USACE | 2021 | $2,274,359 | |
Cal Electro replaced the Building 606 transformer and switchgear together with the overhead transmission lines and security fencing, alongside minor site improvements and the related integration work. Cal Electro delivered Building 606 Electrical Substation Upgrade, MOTCO for USACE in Concord, California in 2021, a $2,274,359 contract. | |||
| WAPA | 2021 | $2,184,032 | |
Cal Electro installed the government-furnished 230kV SSVTs and the 115kV station service transformer, with the automatic transfer switch, safety switches, main distribution panel and the balance of the station service equipment: yard panels, dry-tape, pad-mounted transformers, insulated conductors and conduit. Cal Electro provided the concrete foundations and galvanized steel structures, installed precast cable trench, and removed the old cable and equipment after station service cut-over. Cal Electro delivered Keswick & Maxwell Substations, Station Service Upgrades for WAPA in Redding, California in 2021, a $2,184,032 contract. | |||
| NNSS | 2021 | $4,332,659.98 | |
Cal Electro modernized two substations at the Nevada National Security Site, building one new redundant substation identical to the existing one and making critical upgrades to a second. Cal Electro provided all technical and professional services for the work, including labor, testing, material and equipment. Cal Electro delivered Nevada National Security Site DAF & Frenchman Flats Substations for NNSS in 2021, a $4,332,659.98 contract. | |||
| DWR | 2020 | $1,725,207.54 | |
Cal Electro removed and replaced the unit substation and main switchgear in the maintenance yard, with a 4160V incoming line and 480V main switchgear. Temporary generators were used during the switchover. Cal Electro delivered DWR Unit Substation Replacement, San Luis Operation and Maintenance Center in Merced County, California in 2020, a $1,725,207.54 contract. | |||
| CSU San Jose | 2019 | ||
Cal Electro delivered 4160V to 12kV Conversion, CSU San Jose in California in 2019. | |||
| CSU San Jose | 2017 | ||
Cal Electro delivered Electrical Substation Reliability Improvements, CSU San Jose in California in 2017. | |||
| WAPA | 2017 | $3,546,209.22 | |
Cal Electro removed and replaced the station service switchgear and UHA, with the protective relay systems, instrumentation transformers and metering, the 5kV cables, structural metalwork, and the concrete foundations and slab for the fabricated control building. Cal Electro delivered a turn-key interface with the existing switchyard and with the power plant alarm, protection, control and SCADA circuits, plus a communications interface with the plant's Central Valley Automated Control System. The contract also covered a document management system, drawings and data, as-builts, new cable tray below the existing UHA switchgear, spare parts and training. Cal Electro delivered Folsom UHA Switchgear Replacement, WAPA Switchyard in California in 2017, a $3,546,209.22 contract. | |||
| Cal Poly San Luis Obispo | 2016 | $458,000 | |
Cal Electro replaced the existing 70kV–12.47kV, 10MVA transformer at Mustang Substation with a 15MVA transformer, together with the associated transmission equipment, on the Cal Poly campus. Cal Electro delivered Mustang Substation Bank 1 Replacement, California Polytechnic State University for Cal Poly San Luis Obispo in 2016, a $458,000 contract. | |||
| City of Gridley | 2014 | ||
Cal Electro delivered Substation Infrastructure Project, City of Gridley in California in 2014. | |||
| 2013 | |||
Cal Electro delivered Arden Del Paso Substation in 2013. | |||
| BART | 2013 | ||
Cal Electro delivered BART Substation Transformer Replacement in 2013. | |||
| 2013 | |||
Cal Electro delivered Canby Substation in California in 2013. | |||
| 2013 | |||
Cal Electro delivered COR Moore Substation in 2013. | |||
| 2013 | |||
Cal Electro delivered Orchard Substation, Ukiah in California in 2013. | |||
| 2013 | |||
Cal Electro delivered SAC 2E/2F Substation in 2013. | |||
| WAPA | 2013 | $1,447,256.27 | |
Cal Electro removed and disposed of the existing switches, conductors, wave traps and insulator assemblies, then installed the government-furnished 230kV disconnect switches, motor group-operated and selector/tandem type motor group-operated, with ACCR Drake conductor, high-temperature fittings and insulator assemblies. Cal Electro supplied the associated jumpers, hardware and conduit. Cal Electro delivered Shasta Switchyard, Flanagan and Keswick Substations Upgrades for WAPA in Shasta County, California in 2013, a $1,447,256.27 contract. | |||
| BART | 2012 | ||
Cal Electro delivered Bart Substation South San Francisco in California in 2012. | |||
| 2012 | |||
Cal Electro delivered COR Substation in 2012. | |||
| 2012 | |||
Cal Electro delivered East Redding Substation in California in 2012. | |||
| City of Ukiah | 2011 | $2,980,000 | |
Cal Electro built a new 115kV substation: foundations, 40MVA 115/12kV transformers, 115kV SF6 breakers and switches, 27,000 feet of 12kV 1100 KCM cable, and a 30-by-90-foot pre-manufactured control building. All major electrical equipment was owner supplied. Cal Electro delivered Orchard Substation, Ukiah for City of Ukiah in California in 2011, a $2,980,000 contract. | |||
| Bechtel Nevada | 2004 | ||
Cal Electro delivered Bechtel Nevada Corporation, Nevada Test Site - Modernization of 128kv Substations in 2004. | |||
| City of Redding | 2002 | ||
Cal Electro delivered City of Redding Switchyard Expansion in California in 2002. | |||
| Bechtel Nevada | 2001 | ||
Cal Electro delivered Bechtel Nevada Corporation, Nevada Test Site - Modernization of 128kv Substations in 2001. | |||
| Wheelabrator | 2000 | ||
Cal Electro delivered Wheelabrator Redding, CA Upgrade Substation in California in 2000. | |||
| City of Redding | 1999 | ||
Cal Electro delivered City of Redding East Substation Installation of 115/12kv Transformer bank Number in California in 1999. | |||
| City of Shasta Lake | 1998 | ||
Cal Electro delivered City of Shasta Lake, CA Knauf Substation in California in 1998. | |||
| City of Shasta Lake | 1997 | ||
Cal Electro delivered City of Shasta Lake, CA Corporate Yard Substation in California in 1997. | |||
| City of Redding | 1996 | ||
Cal Electro delivered City of Redding Texas Springs Substation in California in 1996. | |||
| 1995 | |||
Cal Electro delivered Airport Transformer Bank Number 1 in 1995. | |||
| US Navy | 1991 | ||
Cal Electro delivered US Navy China Lake Weapons Center, Repair 35kV Substation in California in 1991. | |||
Bids
Bidding substation construction work? Send the solicitation and the bid date.
Plans and addenda go to info@calelectroinc.com, or call (530) 223-5937.