55 years of public works electrical.
131 projects published in full
The record
Filter by owner, market or year. Open a title for the write-up, the photographs and the contract detail.
Every project here carries its year and market, with the owner and contract amount where the records carry them. Decades more sit in the files.
The record prints clean for a prequalification package, with every write-up open and the filters gone.
Cal Electro, Inc. · Past performance · 3710 Electro Way, Redding, CA 96002 · (530) 223-5937 · CSLB 390480 A · B · C-10 · Surety bonding $30M · EMR 0.80
| Project | Owner | Year | Contract |
|---|---|---|---|
| 2026 | |||
| City of Anderson | 2026 · upcoming | $247,311.69 | |
Cal Electro is furnishing and installing an 80kW standby generator and its associated infrastructure at the Anderson Library, on a project that also adds a ground-mount photovoltaic system. Cal Electro was awarded Anderson Library Solar & Standby Generator for City of Anderson in California, 2026, a $247,311.69 contract. | |||
| USACE | 2026 · upcoming | $846,510 | |
Working to USACE requirements, Cal Electro is pulling roughly 15,000 feet of cable, installing conduit and stub-ups, and setting the electrical switchgear for the generation plant. Cal Electro was awarded MOTCO ERCIP 6.25MW Generation Plant for USACE in Concord, California, 2026, a $846,510 contract. | |||
| 2025 | |||
| WAPA | 2025 | $874,185 | |
Cal Electro demolished the existing Unit Substation DZA, pad-mount transformer and standby generator, then installed a 230kV bay with a motor-operated disconnect switch, SSVTs and associated material. The work also covered a pad-mount transformer, an automatic transfer switch, three safety switches, 35kV power cable, a main distribution switchboard, and the steel structures and foundations that carry them. Cal Electro delivered Olinda Substation, Station Service Upgrades for WAPA in Shasta County, California in 2025, a $874,185 contract. | |||
| BCRAA | 2025 | $739,710 | |
| WAPA | 2025 · ongoing | $2,237,150 | |
Cal Electro is removing and replacing the 500kV power circuit breakers, motor-operated disconnecting switches and motor-operated ground switches in Bay T8, and installing the associated conduit, outdoor bus and control cables. Cal Electro is delivering Tracy 500kV Substation, Bay T8 Breaker & Switch Replacement for WAPA in California, 2025, a $2,237,150 contract. | |||
| 2024 | |||
| WAPA | 2024 | $2,319,355 | |
Cal Electro removed and replaced the 500kV power circuit breakers, motor-operated disconnecting switches and motor-operated ground switches in Bay T10. The contract also covered a surface trench with its associated electrical equipment and site development. Cal Electro delivered Tracy 500kV Substation, Bay T10 Breaker & Switch Replacement for WAPA in California in 2024, a $2,319,355 contract. | |||
| 2023 | |||
| Caltrans | 2023 | $4,456,185 | |
As electrical subcontractor to McCuen Construction on the new scale facility, Cal Electro modified the existing camera systems and installed the lighting systems and controls, a 200kW backup diesel generator, main service gear, and the surveillance and communications systems. Cal Electro delivered Cottonwood Scales Facility for Caltrans in California in 2023, a $4,456,185 contract. | |||
| Caltrans | 2023 | ||
Cal Electro delivered New Cuyama Charging Station for Caltrans in California in 2023. | |||
| SLDMWA | 2023 · ongoing | $5,358,818.79 | |
Cal Electro rehabilitated four single-phase main transformers at the O'Neill Pumping-Generating Plant, three in service and one spare, refilling them with synthetic ester fluid and replacing bushings and other critical components. The work was sequenced around coordinated outages, with the plans and testing that required. Cal Electro is delivering O'Neill Pumping Plant Power Transformer Rehabilitation for SLDMWA in Merced County, California, 2023, a $5,358,818.79 contract. | |||
| Caltrans | 2023 | $1,300,000 | |
| 2022 | |||
| Caltrans | 2022 | ||
Cal Electro delivered Douglass City 36" Trenchless Pipe for Caltrans in 2022. | |||
| Caltrans | 2022 | ||
Cal Electro delivered Fuel Station Canopy for Caltrans in 2022. | |||
| USACE | 2022 | $4,890,000 | |
Cal Electro designed and built a complete standby power plant to power the MOTCO pier, comprising fuel tanks, transfer pumps, switchgear, a load bank, automatic transfer switch, transformer and the associated electrical and mechanical equipment. Civil work covered site preparation, concrete pads, electrical grounding, site lighting, fencing and bollards, and the required demolition. Cal Electro delivered MOTCO Wharf 2 Standby Power Plant for USACE in Concord, California in 2022, a $4,890,000 contract. | |||
| 2021 | |||
| USACE | 2021 | $2,274,359 | |
Cal Electro replaced the Building 606 transformer and switchgear together with the overhead transmission lines and security fencing, alongside minor site improvements and the related integration work. Cal Electro delivered Building 606 Electrical Substation Upgrade, MOTCO for USACE in Concord, California in 2021, a $2,274,359 contract. | |||
| WAPA | 2021 | $2,184,032 | |
Cal Electro installed the government-furnished 230kV SSVTs and the 115kV station service transformer, with the automatic transfer switch, safety switches, main distribution panel and the balance of the station service equipment: yard panels, dry-tape, pad-mounted transformers, insulated conductors and conduit. Cal Electro provided the concrete foundations and galvanized steel structures, installed precast cable trench, and removed the old cable and equipment after station service cut-over. Cal Electro delivered Keswick & Maxwell Substations, Station Service Upgrades for WAPA in Redding, California in 2021, a $2,184,032 contract. | |||
| NNSS | 2021 | $4,332,659.98 | |
Cal Electro modernized two substations at the Nevada National Security Site, building one new redundant substation identical to the existing one and making critical upgrades to a second. Cal Electro provided all technical and professional services for the work, including labor, testing, material and equipment. Cal Electro delivered Nevada National Security Site DAF & Frenchman Flats Substations for NNSS in 2021, a $4,332,659.98 contract. | |||
| 2020 | |||
| Caltrans | 2020 | ||
Cal Electro delivered CCTV Barney Road, Anderson for Caltrans in California in 2020. | |||
| DWR | 2020 | $1,725,207.54 | |
Cal Electro removed and replaced the unit substation and main switchgear in the maintenance yard, with a 4160V incoming line and 480V main switchgear. Temporary generators were used during the switchover. Cal Electro delivered DWR Unit Substation Replacement, San Luis Operation and Maintenance Center in Merced County, California in 2020, a $1,725,207.54 contract. | |||
| City of Oakland | 2020 | $421,429.31 | |
| Caltrans | 2020 | ||
Cal Electro delivered Pumping Plant Bakersfield/Hanford for Caltrans in California in 2020. | |||
| 2020 | |||
Cal Electro delivered Red Bluff SLEP Site Improvements in California in 2020. | |||
| 2019 | |||
| CSU San Jose | 2019 | ||
Cal Electro delivered 4160V to 12kV Conversion, CSU San Jose in California in 2019. | |||
| Caltrans | 2019 | $3,385,154.24 | |
| Caltrans | 2019 | ||
Cal Electro delivered Crosswalk & Ped-Activated Beacon, C for Caltrans in 2019. | |||
| Diablo Valley College | 2019 | ||
Cal Electro delivered Diablo Valley College Replacement of Main Electrical Switchgear in 2019. | |||
| Caltrans | 2019 | ||
Cal Electro delivered Siskiyou County Charging Stations for Caltrans in California in 2019. | |||
| Caltrans | 2019 | ||
Cal Electro delivered Trinity County Charging Stations for Caltrans in California in 2019. | |||
| City of South Lake Tahoe | 2019 | $6,136,535 | |
Cal Electro replaced the treatment plant's emergency generator, beginning with demolition of the existing generator, breakpoint chamber, engine-driven pump motor, main electrical switchgear, and miscellaneous piping and duct banks. The replacement went into a new building, with new electrical switchgear, piping and a fuel tank. Site work regraded several areas to improve drainage, relocated existing utility piping and installed new electrical duct banks. Cal Electro delivered Wastewater Treatment Plant Emergency Generator Replacement, South Lake Tahoe for City of South Lake Tahoe in California in 2019, a $6,136,535 contract. | |||
| 2018 | |||
| CA Dept. of Fish & Wildlife | 2018 | $598,000 | |
Cal Electro repaired and replaced material, cross arms and hardware on deteriorating wood poles, and replaced the overhead transformers along with roughly 2,300 feet of overhead conductor and the underground 12kV. Cal Electro delivered Overhead Electrical System Replacement & Upgrade, Fish Springs Hatchery for CA Dept. of Fish & Wildlife in California in 2018, a $598,000 contract. | |||
| Caltrans | 2018 | ||
Cal Electro delivered Upgrade Pumping Plans, Santa Barba for Caltrans in 2018. | |||
| 2017 | |||
| CSU San Jose | 2017 | ||
Cal Electro delivered Electrical Substation Reliability Improvements, CSU San Jose in California in 2017. | |||
| WAPA | 2017 | $3,546,209.22 | |
Cal Electro removed and replaced the station service switchgear and UHA, with the protective relay systems, instrumentation transformers and metering, the 5kV cables, structural metalwork, and the concrete foundations and slab for the fabricated control building. Cal Electro delivered a turn-key interface with the existing switchyard and with the power plant alarm, protection, control and SCADA circuits, plus a communications interface with the plant's Central Valley Automated Control System. The contract also covered a document management system, drawings and data, as-builts, new cable tray below the existing UHA switchgear, spare parts and training. Cal Electro delivered Folsom UHA Switchgear Replacement, WAPA Switchyard in California in 2017, a $3,546,209.22 contract. | |||
| Caltrans | 2017 | ||
Cal Electro delivered Install Heavy Duty Fences for Caltrans in 2017. | |||
| 2017 | |||
Cal Electro delivered Install of AWOS II System at Benton Airport in California in 2017. | |||
| Caltrans | 2017 | ||
Cal Electro delivered Kings County Install Signals & Modify Curbs for Caltrans in California in 2017. | |||
| Caltrans | 2017 | ||
Cal Electro delivered Tehama County, Replace POW for Caltrans in California in 2017. | |||
| 2016 | |||
| Caltrans | 2016 | ||
| City of Gridley | 2016 | $162,859.41 | |
| Caltrans | 2016 | ||
Cal Electro delivered Donner Pass Comml Vehicle Insp Faclty for Caltrans in 2016. | |||
| Caltrans | 2016 | ||
Cal Electro delivered Modify Fiber Obtic Cable System for Caltrans in 2016. | |||
| Cal Poly San Luis Obispo | 2016 | $458,000 | |
Cal Electro replaced the existing 70kV–12.47kV, 10MVA transformer at Mustang Substation with a 15MVA transformer, together with the associated transmission equipment, on the Cal Poly campus. Cal Electro delivered Mustang Substation Bank 1 Replacement, California Polytechnic State University for Cal Poly San Luis Obispo in 2016, a $458,000 contract. | |||
| 2016 | |||
Cal Electro delivered W. Apron & T-Hanger Taxilane in 2016. | |||
| 2015 | |||
| CHP | 2015 | $2,089,000 | |
Cal Electro transported, erected and installed an owner-furnished 120-foot tower, self-supporting, four-legged and pre-manufactured, moving it from West Sacramento to the Colby Mountain site. Cal Electro also built the foundations, a separate generator building with emergency backup generator, a photovoltaic panel field, a propane fuel system and the electrical utilities. Cal Electro delivered Communications Towers & Vault, Colby Mountain for CHP in Forest Ranch, Tehama County, California in 2015, a $2,089,000 contract. | |||
| Caltrans | 2015 | ||
Cal Electro delivered Fluorescent Light Replacement for Caltrans in 2015. | |||
| Caltrans | 2015 | ||
Cal Electro delivered Painting, Flooring, and Roof REPAIRS/D2 for Caltrans in 2015. | |||
| 2015 | |||
Cal Electro delivered Relocate Runway 18 REIL Del Norte Airport in Del Norte County, California in 2015. | |||
| 2014 | |||
| Caltrans | 2014 | $1,889,500 | |
As subcontractor to Myers and Sons Construction, Cal Electro furnished the labor and materials for a temporary signal system and barrier post system, wastewater and water supply systems, traffic management, a changeable message sign, a radar feedback sign, a modified flashing beacon, and the building electrical work. Cal Electro delivered 10-0J92U4 Mokelumne Bridge for Caltrans in 2014, a $1,889,500 contract. | |||
| Alderpoint County Water District | 2014 | $1,530,332.49 | |
| Caltrans | 2014 | ||
Cal Electro delivered Bogard & O'brien Emergency Wells for Caltrans in 2014. | |||
| Siskiyou Power Authority | 2014 | $376,542.07 | |
| 2014 | |||
Cal Electro delivered Electrical Underground Rebuild and Re-Conductor Project in 2014. | |||
| City of Biggs | 2014 | $1,839,000 | |
Cal Electro built the plant improvements: new influent piping and manholes, a spiral mechanical screen, a new concrete sewer influent wet well, an influent pump distribution system, field piping, valves, a flow meter and a new influent sampler, tied into the existing gravity and force main system. Electrical work covered services for the new equipment, a SCADA system and its telemetry, and a backup generator. The contract also included a manual bar screen with associated piping modifications, replacement of field valves across the facility, repair or replacement of a vertical pump, and fencing and gates. Cal Electro delivered Phase 1 Wastewater Treatment Improvement Project, Biggs for City of Biggs in California in 2014, a $1,839,000 contract. | |||
| FAA / BCRAA | 2014 | $2,005,290 | |
Cal Electro furnished all labor and materials for the runway lighting systems, the electrical and generator vault installations, and the underground conduit infrastructure. The scope also covered removal and replacement of guidance signs and concrete pads, and construction of a new CMU electrical building. Cal Electro delivered Runway Safety Area Improvements, Del Norte County Airport for FAA / BCRAA in California in 2014, a $2,005,290 contract. | |||
| City of Gridley | 2014 | ||
Cal Electro delivered Substation Infrastructure Project, City of Gridley in California in 2014. | |||
| 2013 | |||
| 2013 | |||
Cal Electro delivered Arden Del Paso Substation in 2013. | |||
| BART | 2013 | ||
Cal Electro delivered BART Substation Transformer Replacement in 2013. | |||
| 2013 | |||
Cal Electro delivered Canby Substation in California in 2013. | |||
| 2013 | |||
Cal Electro delivered COR Moore Substation in 2013. | |||
| Caltrans | 2013 | ||
Cal Electro delivered Gibson Maintenance Facility for Caltrans in 2013. | |||
| Caltrans | 2013 | ||
Cal Electro delivered Install Flashing Warning Signs for Caltrans in 2013. | |||
| Caltrans | 2013 | ||
Cal Electro delivered Install Rigid Towers for CCTV for Caltrans in 2013. | |||
| Caltrans | 2013 | ||
Cal Electro delivered Install Traffic Monitor Stations for Caltrans in 2013. | |||
| Caltrans | 2013 | ||
Cal Electro delivered N.of Gridley-Pavement Rehab-W/Knife River for Caltrans in California in 2013. | |||
| 2013 | |||
Cal Electro delivered Orchard Substation, Ukiah in California in 2013. | |||
| Oregon Air Guard | 2013 | $51,160 | |
Cal Electro designed and installed new lightning protection for the Oregon Air Guard. Cal Electro delivered Oregon Air Guard Lightning Protection in 2013, a $51,160 contract. | |||
| Caltrans | 2013 | ||
Cal Electro delivered Radio Pads for Caltrans in 2013. | |||
| Caltrans | 2013 | ||
Cal Electro delivered Red Bluff Flashing Beacons for Caltrans in California in 2013. | |||
| 2013 | |||
Cal Electro delivered SAC 2E/2F Substation in 2013. | |||
| WAPA | 2013 | $1,447,256.27 | |
Cal Electro removed and disposed of the existing switches, conductors, wave traps and insulator assemblies, then installed the government-furnished 230kV disconnect switches, motor group-operated and selector/tandem type motor group-operated, with ACCR Drake conductor, high-temperature fittings and insulator assemblies. Cal Electro supplied the associated jumpers, hardware and conduit. Cal Electro delivered Shasta Switchyard, Flanagan and Keswick Substations Upgrades for WAPA in Shasta County, California in 2013, a $1,447,256.27 contract. | |||
| Caltrans | 2013 | ||
Cal Electro delivered Yreka Hwy 3 Lighting for Caltrans in California in 2013. | |||
| 2012 | |||
| 2012 | |||
Cal Electro delivered 12kv Underground Distribution System Cable Replacement in 2012. | |||
| BART | 2012 | ||
Cal Electro delivered Bart Substation South San Francisco in California in 2012. | |||
| 2012 | |||
Cal Electro delivered Colusa County Airport in California in 2012. | |||
| 2012 | |||
Cal Electro delivered COR Substation in 2012. | |||
| 2012 | |||
Cal Electro delivered East Redding Substation in California in 2012. | |||
| 2012 | |||
Cal Electro delivered Gansner Field Airport & Beckwourth-Nervino in 2012. | |||
| 2012 | |||
Cal Electro delivered Hewlett Subdivision 12kv Upgrade in 2012. | |||
| 2012 | |||
Cal Electro delivered Lampson Field Airport in 2012. | |||
| 2011 | |||
| Shasta College | 2011 | ||
| 2011 | |||
Cal Electro delivered Alternate Intake Project, 69kv Transmission Line in 2011. | |||
| Bellevue Union School District | 2011 | ||
Cal Electro delivered Bellvue Unified School District Solar for Bellevue Union School District in 2011. | |||
| City of Ukiah | 2011 | $2,980,000 | |
Cal Electro built a new 115kV substation: foundations, 40MVA 115/12kV transformers, 115kV SF6 breakers and switches, 27,000 feet of 12kV 1100 KCM cable, and a 30-by-90-foot pre-manufactured control building. All major electrical equipment was owner supplied. Cal Electro delivered Orchard Substation, Ukiah for City of Ukiah in California in 2011, a $2,980,000 contract. | |||
| 2010 | |||
| 2010 | |||
Cal Electro delivered Big O Tires Rooftop Array in 2010. | |||
| 2010 | |||
Cal Electro delivered Klamath Security Gates in California in 2010. | |||
| 2010 | |||
Cal Electro delivered Wild Horse Ranch, Platina, CA in California in 2010. | |||
| 2009 | |||
| Butte College | 2009 | ||
Cal Electro delivered Butte College Solar Project in 2009. | |||
| 2008 | |||
| Milpitas USD | 2008 | ||
Cal Electro delivered Milpitas Unified School District Solar Project for Milpitas USD in California in 2008. | |||
| 2008 | |||
Cal Electro delivered Monterey DASR in California in 2008. | |||
| 2008 | |||
Cal Electro delivered Redding Airport Taxiway A&B in California in 2008. | |||
| 2007 | |||
| 2007 | |||
Cal Electro delivered Panamint Valley DASR in 2007. | |||
| FAA | 2007 | $1,550,000 | |
Cal Electro completed the earthwork, grading and foundations for a radar tower, equipment shelter, generator building and related infrastructure at Velvet Peak. The scope included CMU building construction, tower erection, grounding systems, power and communication conduits, diesel fuel systems, radar reflector installation, waveguide setup and SIU rack integration. Cal Electro delivered Velvet Peak Radar Site DASR for FAA in Barstow, California in 2007, a $1,550,000 contract. | |||
| 2006 | |||
| 2006 | |||
Cal Electro delivered Fall River Mills Runway Lighting in California in 2006. | |||
| 2004 | |||
| Bechtel Nevada | 2004 | ||
Cal Electro delivered Bechtel Nevada Corporation, Nevada Test Site - Modernization of 128kv Substations in 2004. | |||
| 2003 | |||
| USBR | 2003 | $1,023,500 | |
Cal Electro modified three cranes, installing new load cells, VFDs, festoon systems, wire rope, rail foundation, operator controls and a 140-ton trolley. The work included load testing the 140-ton crane with water weights on Folsom Dam Boulevard. Cal Electro delivered Folsom Cranes for USBR in California in 2003, a $1,023,500 contract. | |||
| USBR | 2003 | $996,000 | |
Cal Electro rehabilitated a 125-ton gantry crane at Shasta Dam, installing new VSDs, an engine generator, an automatic rope re-winder, operator controls, wire rope, and a fuel tank and platform. Cal Electro delivered Shasta Crane for USBR in 2003, a $996,000 contract. | |||
| 2003 | |||
Cal Electro delivered Alameda County Fairgrounds Photovoltaic in California in 2003. | |||
| 2003 | |||
Cal Electro delivered Merced DASR in California in 2003. | |||
| 2002 | |||
| El Dorado Irrigation District | 2002 | $690,000 | |
Cal Electro installed flood protection at the power house: removing windows, placing and grout-injecting concrete walls, demolishing existing equipment and walls, fitting water-tight doors, and carrying out erosion control outside the building. Cal Electro delivered EID Power House for El Dorado Irrigation District in 2002, a $690,000 contract. | |||
| City of Redding | 2002 | ||
Cal Electro delivered City of Redding Switchyard Expansion in California in 2002. | |||
| 2002 | |||
Cal Electro delivered Fresno Yosemite Airport DASR in California in 2002. | |||
| 2002 | |||
Cal Electro delivered Seaside Park Photovoltaic in 2002. | |||
| 2001 | |||
| DWR | 2001 | $1,600,000 | |
Cal Electro installed the crane controls at the Oroville power house for the Department of Water Resources. Cal Electro delivered Oroville Power House for DWR in California in 2001, a $1,600,000 contract. | |||
| Bechtel Nevada | 2001 | ||
Cal Electro delivered Bechtel Nevada Corporation, Nevada Test Site - Modernization of 128kv Substations in 2001. | |||
| City of Redding | 2001 | ||
Cal Electro delivered City of Redding Generator in California in 2001. | |||
| 2001 | |||
Cal Electro delivered Redding Airport Runway Lighting Upgrade in California in 2001. | |||
| 2000 | |||
| 2000 | |||
Cal Electro delivered FAA Maui, HI ASR 9 Upgrade in Hawaii in 2000. | |||
| Wheelabrator | 2000 | ||
Cal Electro delivered Wheelabrator Redding, CA Upgrade Substation in California in 2000. | |||
| 1999 | |||
| City of Redding | 1999 | ||
Cal Electro delivered City of Redding East Substation Installation of 115/12kv Transformer bank Number in California in 1999. | |||
| 1999 | |||
Cal Electro delivered FAA Monterey, CA Installation of E/G shelter at ASR 9 in California in 1999. | |||
| FAA | 1999 | ||
Cal Electro delivered FAA Northern California Tracon Project in 1999. | |||
| 1998 | |||
| City of Sacramento | 1998 | $385,000 | |
| City of Shasta Lake | 1998 | ||
Cal Electro delivered City of Shasta Lake, CA Knauf Substation in California in 1998. | |||
| 1998 | |||
Cal Electro delivered FAA Boulder City, NV VORTAC Antennas in Nevada in 1998. | |||
| 1998 | |||
Cal Electro delivered FAA Maui, HI Wind Sock in Hawaii in 1998. | |||
| 1998 | |||
Cal Electro delivered MALSR, Independence Municipal Airport, Independence, Kansas in 1998. | |||
| 1997 | |||
| City of Shasta Lake | 1997 | ||
Cal Electro delivered City of Shasta Lake, CA Corporate Yard Substation in California in 1997. | |||
| 1997 | |||
Cal Electro delivered FAA Grand Canyon, AZ Wind Sock in Arizona in 1997. | |||
| 1997 | |||
Cal Electro delivered FAA Pomona, CA VORTAC Antennas in California in 1997. | |||
| USAF | 1997 | ||
Cal Electro delivered USAF Nellis Airforce Base in Nevada in 1997. | |||
| 1996 | |||
| City of Redding | 1996 | ||
Cal Electro delivered City of Redding Texas Springs Substation in California in 1996. | |||
| 1996 | |||
Cal Electro delivered FAA Arcata, CA PAPI Guidance System in California in 1996. | |||
| 1996 | |||
Cal Electro delivered FAA Chico Airport PAPI Guidance System in California in 1996. | |||
| 1996 | |||
Cal Electro delivered FAA Oakland, CA Upgrade HVAC at AFSS in California in 1996. | |||
| 1996 | |||
Cal Electro delivered FAA Squaw Peak, CA Engine Generator Replacement in 1996. | |||
| 1995 | |||
| 1995 | |||
Cal Electro delivered Airport Transformer Bank Number 1 in 1995. | |||
| 1995 | |||
Cal Electro delivered FAA Fresno, Modesto, Reno, (E/G Airport) in 1995. | |||
| 1995 | |||
Cal Electro delivered FAA Oakland, CA Installation of UPS At AFSS in California in 1995. | |||
| 1994 | |||
| 1994 | |||
Cal Electro delivered AWOS System Lampson Field in 1994. | |||
| City of Redding | 1994 | $1,307,000 | |
Cal Electro installed the phase two electrical for Zurn Nepco at the Redding Peaking Power Plant: finish grading, foundations, the control building, pipe supports, medium voltage cable, control cables, underground duct bank, buss duct and switchgear. The scope ran through to testing and commissioning of the three 20-megawatt generators. Cal Electro delivered City of Redding Peaking Power Plant in California in 1994, a $1,307,000 contract. | |||
| 1994 | |||
Cal Electro delivered FAA Arcata Airport (MALSR) in California in 1994. | |||
| 1991 | |||
| US Navy | 1991 | ||
Cal Electro delivered US Navy China Lake Weapons Center, Repair 35kV Substation in California in 1991. | |||
No project in the record matches those filters.
The record holds 131 projects published in full. Widen one of the filters, or clear them and start again.
Contract amounts are Cal Electro's published figures.